Electromechanical engineering · Kigali, Rwanda · Since 2003 +250 782 212 428 WhatsApp [email protected]

Free tool · Lightning protection

Lightning risk assessment and protection sizing.

Work out the lightning risk for your building with the IEC 62305-2 method, the protection level it needs, and a complete ESE or mesh design with earthing, surge protection and a bill of materials.

1 · The building

2 · The site

Ground flash density sets how often lightning strikes the ground near you. Choosing a region fills in a typical value; type a measured value if you have one.

3 · Design

Your lightning protection design.

Change the building or site details above and the design updates.

Where the risk comes from

Risk components without protection (IEC 62305-2)

Recommended: ESE system (NF C 17-102)

–ESE terminals
–advance ΔT
–mast above roof
–protection radius
Protection level
–
Radius needed to cover the roof
–
Layout
–
Down conductors
–
Conductor
Tinned copper tape 30 × 2 mm (60 mm²), fixed every metre
Strike counter
1, on the main down conductor

Alternative: conventional mesh (IEC 62305-3)

Mesh size
–
Rolling sphere radius
–
Roof conductor
–
Air rods (0.5 m)
–
Down conductors
–

A mesh suits flat roofs and long buildings. An ESE system needs less conductor on the roof and is quicker to install on pitched and iron-sheet roofs.

Earthing (each down conductor)

Target resistance
Below 10 Ω
Soil resistivity (typical)
–
One 2.4 m rod
–
Earth electrode
–
Expected resistance
–

Every earth is bonded to the building's main earth, fitted with a test joint and an inspection pit, and measured on handover.

Surge protection (IEC 62305-4)

    Inspection & maintenance

    Visual inspection
    –
    Full inspection and earth test
    –
    After a known strike
    Inspect within days
    Maintenance plans

    4 · Materials

    Estimated bill of materials (ESE system).

    Quantities for budgeting. Final quantities come from the site survey and roof drawings.

    ItemSpecificationQty
    Request a site survey and quote

    This tool gives an engineering estimate using simplified IEC 62305-2 risk components (R1: RA, RB, RC, RM, RU, RV, RW, RZ), NF C 17-102 protection radii and IEC 62305-3 mesh rules. It is not a certified design. Lightning density values for Rwanda are typical estimates. A site survey, soil resistivity test and inspection of the incoming services are needed before installation.

    Questions

    About the risk assessment.

    What does the risk assessment calculate?

    It estimates R1, the risk of loss of human life, following the method of IEC 62305-2. It combines the expected number of lightning strikes to the building and to its incoming power and telecom lines with the probability and consequences of injury, fire and failure of critical systems, and compares the result with the tolerable risk of 1 in 100,000 per year.

    How does it choose the protection level?

    It tests protection levels IV, III, II and I, each with matching surge protection, and selects the lowest level that brings the risk below the tolerable value. If even Level I is not enough, it adds enhanced surge protection and flags the building for a detailed design.

    How is the ESE air terminal sized?

    The protection radius follows NF C 17-102: Rp = √(2rh − h² + ΔL(2r + ΔL)), where h is the height of the terminal above the roof, r depends on the protection level (20, 30, 45 or 60 m) and ΔL is the terminal's early streamer advance in metres. The tool finds the smallest number of terminals, the lowest ΔT and the shortest mast that cover the whole roof.

    Where does the lightning density for Rwanda come from?

    Rwanda has some of the highest lightning activity in the world, especially in the west and north and around Lake Kivu. The regional values in the tool are typical estimates for planning. If you have a measured ground flash density for your site, enter it instead.

    Is this a certified design?

    No. It is a detailed first estimate to help you plan, budget and compare options. A certified design requires a site survey: we check the roof, the structure, the soil resistivity and the incoming services, then issue the design, drawings and test report.

    Call WhatsApp