Free tool · Generators & backup power
What size generator and UPS do you need?
Add the equipment you want to keep running during a power cut. We calculate the generator kVA, the UPS for sensitive equipment, and roughly how much diesel it will use.
Recommended
- Running load
- –
- Largest motor start
- –
- Supply
- –
- Diesel at this load
- –
- UPS for IT & sensitive loads
- –
- UPS battery (approx.)
- –
This is a large installation. We recommend a site load survey so the generator, changeover and cabling are sized on measured data.
Get a quote for this size Send these results on WhatsAppEstimate only: power factor 0.8, 25% margin, and the starting load of the largest motor. Lifts, welding, X-ray and large chillers need a site survey.
Generators, UPS & changeover
One team for the whole backup system.
We supply and install the generator, the automatic changeover panel, the UPS and batteries, and the cabling between them, then maintain them on a maintenance plan. Socomec and iTeaQ Power UPS, and generators from small standby sets to large prime-power units.

Questions
About generator and UPS sizing.
How do you size a generator?
Add up the running power of everything the generator must supply, convert it to kVA using a power factor of 0.8, allow for the extra current that motors (pumps, fridges, air conditioners, lifts) draw when they start, and keep a margin so the generator is not overloaded. For large sites we confirm this with a load survey on your distribution boards.
Do I need a UPS if I have a generator?
Usually yes for computers, servers, CCTV, network and medical equipment. A generator takes several seconds to start and switch over; a UPS keeps that equipment running without interruption and protects it from voltage drops and spikes.
Why are motors counted differently?
Electric motors draw several times their running current for a moment when they start. The calculator adds the starting load of the largest motor so the generator does not stall when a pump or compressor switches on.
Can you size generators for hospitals, factories and large buildings?
Yes. We supply and install large standby and prime-power generators with automatic changeover. For these sites we measure the load on site rather than relying on an online estimate.