Electromechanical engineering · Kigali, Rwanda · Since 2003 +250 782 212 428 WhatsApp [email protected]

Free tool · Generators & backup power

What size generator and UPS do you need?

Add the equipment you want to keep running during a power cut. We calculate the generator kVA, the UPS for sensitive equipment, and roughly how much diesel it will use.

Equipment to keep running

Enter how many of each you have. Edit the watts if you know them (they are on the equipment label).

EquipmentWatts eachQuantity

Recommended

–generator (standby)
Running load
–
Largest motor start
–
Supply
–
Diesel at this load
–
UPS for IT & sensitive loads
–
UPS battery (approx.)
–
Get a quote for this size Send these results on WhatsApp

Estimate only: power factor 0.8, 25% margin, and the starting load of the largest motor. Lifts, welding, X-ray and large chillers need a site survey.

Generators, UPS & changeover

One team for the whole backup system.

We supply and install the generator, the automatic changeover panel, the UPS and batteries, and the cabling between them, then maintain them on a maintenance plan. Socomec and iTeaQ Power UPS, and generators from small standby sets to large prime-power units.

iTeaQ tower UPS supplied by ELEMAC

Questions

About generator and UPS sizing.

How do you size a generator?

Add up the running power of everything the generator must supply, convert it to kVA using a power factor of 0.8, allow for the extra current that motors (pumps, fridges, air conditioners, lifts) draw when they start, and keep a margin so the generator is not overloaded. For large sites we confirm this with a load survey on your distribution boards.

Do I need a UPS if I have a generator?

Usually yes for computers, servers, CCTV, network and medical equipment. A generator takes several seconds to start and switch over; a UPS keeps that equipment running without interruption and protects it from voltage drops and spikes.

Why are motors counted differently?

Electric motors draw several times their running current for a moment when they start. The calculator adds the starting load of the largest motor so the generator does not stall when a pump or compressor switches on.

Can you size generators for hospitals, factories and large buildings?

Yes. We supply and install large standby and prime-power generators with automatic changeover. For these sites we measure the load on site rather than relying on an online estimate.

Call WhatsApp